Traffic Engineering
TRAIN CONTROL SYSTEM
- Central computer system with 1oo2D or 2oo3D implementation and service based hot-failover
- Redundant dispatcher computer systems with 1 – 8 monitors
- Unalterable audit proof event record
- 1oo1D, 1oo2D or 2oo3D on-board computer in tractive unit ensuring local track movement safety with decentralized safety decisions
- Fail-safe transmission of movement authority commands using high performance data radio system
- Project handling according to EN50126, EN50128, EN50129 • Project monitoring by accredited assessors • Implementation in dependency of risk analysis according to SIL 1/2/3/4
PASSENGER INFORMATION
- Interior and exterior information displays and acoustic information inside/outside the vehicle
- Dynamic real-time passenger information at the stations
- Standard interfaces for connection to transport associations according to VDV
MOBILE AUTOMATIC TRACK WARNING SYSTEM FOR TRACK WORKSITES
- Local safeguarding of track worksites and track workers by continuous GPS monitoring and train movement surveillance